Install Landing Gear - Pro Built GILES 202 Assembly Instructions Manual

Arf kit giles 202 - 35 % - 93” ( 2.36 m )
Table of Contents

Advertisement

Below the rudder servo trays in the tail there are two small slots. These are for the pull-pull
cables. Please note that in building 2 prototypes and 2 production models, in every case the
plane has balanced acceptably (more or less) without the rudder servos in the tail. Using a
pull-pull is desirable unless you are using a heavier engine.
All the test planes used either a BME 102, a ZDZ-80 single, or a 3W 75F single. These en-
gines all weigh roughly the same, under 5 pounds ( 2.3 Kg ) bare.
4.
Throttle and (optional) choke servo installation.
We recommend that a small servo be used to operate the choke as well as the throttle. This
provides an extra level of safety by acting as a secondary engine kill mechanism in case of
failure in the throttle control system.
It is impossible to anticipate every potential throttle layout for every engine, so make sure
that the installation is according to the engine's manufacturer.
9.

Install landing gear

15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents