Section 4: Wiring; Installing The Fireplace Control Box - Montigo R520 Installation Manual

R-series indoor residential fireplace
Table of Contents

Advertisement

Section 4: Wiring

Installing the Fireplace Control Box

Install the Fireplace Control Box in an accessible location. The
location should be where maintenance, adjustments and service
may be made easily.
required for either Horizontal
or Vertical Termination Vent
Horizontal
Power Vent
Termination
Control
115Vac 60 Hz
Box
supply from
Distribution Panel
Power
Wall Switch
Vent
20 foot control
cable to replace
(standard)
Figure 15.
R520* Series Control Box / Power Vent Wire Routing Diagram
XG0771 - 150204
Installation
Vertical
Power Vent
Termination
Power cable Installatio n
R520 Power Vent Indoor Gas Fireplace
Page 21

Advertisement

Table of Contents
loading

Table of Contents