Panasonic AG-7350 Series Service Manual page 59

Editing video cassette recorder ag-7350/ editing video cassette player ag-7150
Hide thumbs Also See for AG-7350 Series:
Table of Contents

Advertisement

5. Tighten the 4 screws (D) as shown in Figure M66.
Figure M66
6. Manually move the loading mechanism toward the
EJECT position.
7. Stop the manual eject procedure just before comple-
tion, so that the Sub Wiper Arms straight up. This posi-
tion is also characterized by the channel guides (in the
Wiper Arms) being directly under the cut outs on the top
of the Cassette Compartment base(Figure M67).
8. Install the Cassette Holder Unit in the Cassette Com-
partment Base. The Cassette Holder should drop into
place If the Sub Wiper Arms are portioned as called for
in step 7.
(Top View of Cassette Compartment Base)
Wiper Arm Guide Channels Align
Directly Under Cut Outs This Allows
The Cassette
Holder to Full Right in Place When
Assembling
-----~ ~-~-~~
-----
------~
--------------
- . . . . . . . . . . _ _ _ ~
*
Please Note This is Not Final Eject Position.
Figure M67
<<NOTE>>
For proper front loading, the guide pin on the opener lever
should follow the upper track of the right side panel as shown
in Figure M68.
l
Safety Traps
..------
Path (Opener Lever) Guide Pin Should Taxe
Push Up Here
Guide~
Pin
Push Down Here
Top View
The Opener Lever is Attached to the Cassette Holder
Figure M68 Right Side Plate
9. Install the top plate on the Cassette Compartment Base
and tighten the 2 screws (A) as shown in Figure M60.
10. Manually confirm that front loading and main loading
run smoothly. Also confirmEJECT before power is ap-
plied.
4-21
....
z
w
::!
....
en
::::)
..,
c
<
...J
<
(.)
z
<
:I:
(.)
w
::!

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ag-7150 series

Table of Contents