PRIMARY AND SECONDARY SHEAVES
100 Nm (10.0 m
kg, 72 ft
•
100 Nm (10.0 m
•
10 Nm (1.0 m
Order
Job name/Part name
Removing the primary and
secondary sheaves
Front fender
Rear fender
Right footrest board
1
Drive belt case cover
2
Rubber gasket
3
Bearing housing
4
Dowel pin
PRIMARY AND SECONDARY SHEAVES
10 Nm (1.0 m
kg, 7.2 ft
•
8
lb)
•
kg, 72 ft
lb)
•
kg, 7.2 ft
Ib)
•
•
(14)
1
10 Nm (1.0 m
kg, 7.2 ft
•
Ib)
•
(9)
6
7
5
4
3
10 Nm (1.0 m
2
Ib)
•
Q'ty
Remove the parts in the order below.
Refer to "SEAT, CARRIERS, FENDERS
AND FUEL TANK".
Refer to "SEAT, CARRIERS, FENDERS
AND FUEL TANK" in CHAPTER 3.
(Manual No.: 5TE2-AE1)
Refer to "FOOTREST BOARDS" in
CHAPTER 3.
(Manual No.: 5TE2-AE1)
1
1
1
2
– 54 –
ENG
10
9
4
kg, 7.2 ft
Ib)
•
•
Remarks