CRANKSHAFT
Order
Job name/Part name
Removing the crankshaft
Crankcase separation
1
Oil strainer
2
Balancer
3
Crankshaft
2
3
– 68 –
CRANKSHAFT
1
4 Nm (0.4 m
kg, 2.9 ft
•
Q'ty
Remove the parts in the order below.
Refer to "CRANKCASE".
1
1
Refer to "REMOVING THE CRANK-
SHAFT" and "INSTALLING THE CRANK-
SHAFT".
1
For installation, reverse the removal
procedure.
ENG
Ib)
•
Remarks