Working Instructions; Putting Into Operation - Bosch PCM 10 Operating Instructions Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 30
PCM10_WEU.book Seite 10 Donnerstag, 1. Dezember 2005 9:16 09
Variable Horizontal Mitre Angle
12
48
14
12
Standard Vertical Bevel Angles
L
26
17
26
Variable Vertical Bevel Angle
26
50
L
26

Putting into Operation

Switching On and Off
put into operation
2
For safety reasons, the on/off switch of the ma
chine cannot be locked on but must remain de
pressed during operation.
1
sawing
switch off
31

Working Instructions

Before all work on the machine, pull the mains
plug.
General Sawing Instruction
K
49
Working Table Lighting (Power Light)
2
18
Marking the Cutting Line
2
Hand Positioning
31
Maximum Work Piece Dimensions
1
M
Mitre Angle
Mitre
(Horizontal)
English–10
For all cuts, it must first be ensured that
the saw blade at no time can come in con
tact with the fence, screw clamp or other
machine parts. Remove possible interfer
ing auxiliary stops or adjust them accord
ingly.
N
32
O
33
P
Bevel
(Vertical)
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents