Preparations To Be Made Before You Start; Climber Unit, Battery Pack And Handle Unit - Liftkar PT-S 130 Instruction Manual

Table of Contents

Advertisement

5

Preparations to be made before you start

5.1 Climber unit, battery pack and handle unit

The following preparations need to be
made to the Liftkar PT as a base unit:
1. Fit battery pack over the brown
contact housing on the climber unit
with the recess pointing towards
the handle mounting socket (photo
1).
2. Insert the handle unit column into
the battery pack recess (photo 2)
and into the mounting socket.
Press the handle unit down into the
mounting socket until the lever
screw on top of the control cluster
is pressed upwards (photo 3).
3. Tighten the lever screw clockwise.
4. Switch on the main switch (LED display should light up green).
5. Select climbing speed I-II-III.
1
2
3
23

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Liftkar PT-S 130

This manual is also suitable for:

Pt-s 160Pt-outdoor 120Pt-outdoor 150Pt-plus 115

Table of Contents