5
Preparations to be made before you start
5.1 Climber unit, battery pack and handle unit
The following preparations need to be
made to the Liftkar PT as a base unit:
1. Fit battery pack over the brown
contact housing on the climber unit
with the recess pointing towards
the handle mounting socket (photo
1).
2. Insert the handle unit column into
the battery pack recess (photo 2)
and into the mounting socket.
Press the handle unit down into the
mounting socket until the lever
screw on top of the control cluster
is pressed upwards (photo 3).
3. Tighten the lever screw clockwise.
4. Switch on the main switch (LED display should light up green).
5. Select climbing speed I-II-III.
1
2
3
23