Step 5. Optional Blower Kit Wiring - Lennox Meris Series MLDVT-30NM Installation Instructions Manual

Merit mldvt direct-vent gas fireplaces
Table of Contents

Advertisement

LENNOX HEARTH PRODUCTS • MERIT
Note: Remote receiver should be located in the
wall, or if installed in the control compartment,
pulled all the way forward and completely to the
left or right against the corner posts. The door
must be removed first to place the receiver in
the lower control compartment.
7. If wall-mounted ON/OFF control or thermo-
stat is to be used, mount it in a convenient
location on a wall near the fireplace.
8. If an optional control is to be used, wire it in
the low voltage circuit as shown in Figure
38.
Note: The supplied 15 feet of 2 conductor wire
has one end of each conductor connected
to the gas valve circuit and the other end
of each conductor placed loose inside the
bottom compartment.
9. If the optional unit mounted (FRS) control
switch is installed, turn the appliance-
mounted ON/OFF burner control switch to
the OFF position.
10. After the wiring is complete, replace the
cover plate.
Note: No batteries to be installed in the battery
holder until a power outage, or if the appliance is
to be operated solely with two (2) "D" batteries.
SERIES DIRECT-VENT GAS FIREPLACES • MODELS MLDVT-30/35/40/45 • INSTALLATION INSTRUCTIONS
®
BLOWER CONTROL CIRCUIT WIRING
120V, 60HZ, 1PH
* Wall-mounted
ON/ OFF Blower
Switch or Variable
Speed Control Switch.
Junction Box
Tab
Broken
Black
Plug blower
Tab Intact
into this
receptacle
Field Wired
Blower
Factory Wired
Ground
Figure 39 -
J-BOx WIRING
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
Step 5. WIRING: OPTIONAL FORCED
AIR BLOWER KIT
Blower Access
Blower access is through the firebox bottom.
Remove the sub-floor, remove the burner and
remove ten screws securing the GTA assembly
to the firebox.
An electrical outlet box is provided for the instal-
lation of the FBK-100 and FBK-200 forced air
blower kit. Electrical power must be provided
to this box to operate these blowers.
Install the blower kit according to the installation
instructions provided with the kit. Reposition
and reinstall the GTA assembly, burner and
Hot
Side of
sub-floor.
Red
Receptacle
Neutral
Side of
Receptacle
Green
Ground
Screw
25

Advertisement

Table of Contents
loading

Table of Contents