Step 5. Optional Blower Kit Wiring - Lennox Merit Series MLDVTCD-35NE Installation Instructions Manual

Direct-vent contemporary design gas fireplaces merit series
Hide thumbs Also See for Merit Series MLDVTCD-35NE:
Table of Contents

Advertisement

LENNOX HEARTH PRODUCTS • MERIT
Note: No batteries to be installed in the battery
holder until a power outage, or if the appli-
ance is to be operated solely with two (2) "D"
batteries.
SERIES DIRECT-VENT CONTEMPORARY DESIGN GAS FIREPLACES • MODEL MLDVTCD-35 • INSTALLATION INSTRUCTIONS
®
BLOWER CONTROL CIRCUIT WIRING
120V, 60HZ, 1PH
Junction Box
Black
Plug blower
into this
receptacle
Blower
Ground
Figure 37 -
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
* Wall-mounted
ON/ OFF Blower
Switch or Variable
Speed Control Switch.
Tab
Broken
Hot
Side of
Red
Receptacle
Neutral
Side of
Receptacle
Tab Intact
Green
Ground
Screw
Field Wired
Factory Wired
J-BOX WIRING
Step 5. WIRING - OPTIONAL FORCED AIR
BLOWER KIT
Blower Access
Blower access is through the firebox bottom.
Remove the front panel, the porcelain panels,
the sub-floor, remove the burner and remove
ten screws securing the GTA assembly to the
firebox.
An electrical outlet box is provided for the instal-
lation of the FBK-100 and FBK-200 forced air
blower kit. Electrical power must be provided
to this box to operate these blowers. Install the
blower kit according to the installation instruc-
tions provided with the kit.
Reposition and reinstall the GTA assembly,
burner and sub-floor.
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Merit mldvtcd-35nm

Table of Contents