Gasket Replacement
Gasket and gasket surfaces should be thoroughly cleaned and should be free of scratches and other
defects. Gasket should be properly positioned before attempting to retighten bolts. It is recommended
that when a heavy heat exchanger is dismantled for any purpose, it needs to be reassembled with new
gaskets. This will tend to prevent future leaks and/or damage to the gasket-seating surface of the heat
exchanger. Composition gaskets become dried out and brittle so that they do not always provide an
effective seal when re-used, they may provide an imperfect seal or result in deformation and damage to
the gasket contact surface of the exchanger. Follow industry recognized flange bolt tightening practices.
Lifting and Pulling Mechanisms
The following are safe loads for steel rods and eye bolts:
Rods:
Size Tubes
Size Rods
5/8"
3/8"
3/4"
1/2"
1" – larger
5/8"
Eye Bolts:
Size
Safe Load
3/4"
4,000lbs.
1"
6,000lbs.
1 ¼"
10,100lbs.
1 ½"
15,000lbs.
Cleaning Methods
Provide convenient means for cleaning tube bundle frequently as suggested below:
1
Circulating hot wash oil or light distillate through and over the tube at high velocity will effectively
remove sludge or other similar soft deposits.
2
Circulating hot fresh water may wash out soft salt deposits.
3
Some commercially available cleaning compounds may be used to assist in removing sludge or coke,
provided hot wash oil or water, as described above, does not give satisfactory results.
4
Removal of various scales and foreign material by chemical cleaning is now being quite extensively
practiced. Certain qualified organizations will check the nature of deposits to be removed, furnish
proper acid solutions containing inhibitors, and provide equipment and personnel for a complete
apparatus and piping cleaning job.
5
If none of the above methods are effective for the removal of a hard scale, coke, or other deposits,
mechanical means may be used.
Material Safety Data Sheets
Material Safety Data Sheets
Some of Ajax Boiler products contain materials that have been recognized as posing health risks.
Some of Ace Heating products contain materials that have been recognized as posing health risks.
Material Safety Data Sheets for these materials are available from your local Manufacturer's rep. When
Material Safety Data Sheets for these materials are available from your local Manufacturer's rep. When
requesting this information, be sure to have the model number and serial number available.
requesting this information, be sure to have the model number and serial number available.
If you do not know who your local Manufacturer's Rep is, you can find out by logging into the
If you do not know who your local Manufacturer's Rep is, you can find out by logging into the
www.ajaxboiler.com website, and clicking on the Representative tab found in the table of contents.
www.aceheatingllc.com website, and clicking on the Representative tab found in the table of contents.
Safe Load per Rod
1,000lbs.
2,000lbs.
3,000lbs.
Ace Heating Solutions, LLC
Ajax Boiler Inc.
2701 S. Harbor Blvd.
2701 S. Harbor Blvd.
Santa Ana, CA 92704
Santa Ana, CA 92704
PH: 714.540.2230: FAX: 714.540.2239
Parts: 714.437.9050
www.aceheatingllc.com
www.ajaxboiler.com
email: info@ajaxboiler.com

Advertisement

Table of Contents
loading

Related Products for Ace Heating Solutions Packaged Storage Water Heater Steam-to-Water System

This manual is also suitable for:

Phg7210-g-2.1066sa

Table of Contents