Download Print this page

Installing The Indoor Unit; Wiring The Indoor Unit - Tadiran Telecom TGL-9 Installation Instructions

Tadiran tgl/dgl air conditioners installation instructions

Advertisement

Installing the Indoor Unit

Refrigerant line routing
The refrigerant lines may be routed in any of the four
directions shown in Figure 3.
Installing the mounting bracket
Pull out the mounting bracket attached to the back of the unit. See Figure 4.
Position the mounting bracket on the wall and level it using a spirit level.
Mark the four drilling holes on the wall, as they appear in Figure 4.
Drill the holes, insert the wall plugs and use the long screws to
attach the mounting bracket to the wall.
Check that the bracket is level and securely fastened to the wall.
Drilling a hole in the wall
If refrigerant routing No. 3 is chosen, a hole in the wall must be perform.
Mark the center of the hole to be drilled according to the refrigerant
routing used and dimensions shown in Figure 4.
Drill a 70 mm (3") hole in the wall for the refrigerant lines, drainage
hose and electric cables.
If refrigerant line route nos. 1, 2 or 4 are used, use a small saw blade to
carefully remove the corresponding plastic covering on the side panel.
Fill the remaining wall hole gap with an appropriate sealant material.
Mount the indoor unit on the mounting bracket (see Figure 6).
Make sure to drill outwards and downwards, so that the opening in the
outside wall is at least 10 mm lower than the opening on the inside.
Make sure the drainage hose is at the bottom side of the hole.
Drainage water form
Connect the unattached end of the drainage tube to the drainage hose outlet.
Seal the drainage connection to prevent leakage.
Make sure there are no kinks, "U" bends or flattened sections in the tube.
Check that the drainage functions properly. Fill the pan below the unit's coil
with water and observe that freely drains out. See Figure 5.

Wiring the indoor unit

Remove the air conditioner cover by lifting the lower part and
then pulling it gently outward. See Figure 8.
Remove the two screws from the plastic control cover
as shown in Figure 9.
Route the inter-unit electric cable and the outdoor sensor
cable towards the lower right corner of the indoor unit.
For TGL 30 model use a screwdriver to insert the bracketped wire
ends (7 mm) into the terminal block, as shown in Figure 9.
For TGL 9-25 and DGL models insert the bracketped wire ends into
the terminal block and make sure that the screws are properly fastened.
Make sure that the wires are connected in accordance with the wiring
diagram on the inside of the front cover.
Attach the inter-unit electric cable with the cable clamp located on the unit.
Connect the Outdoor Sensor TH3 connector to its mating connector (see Figure 9).
Close the Plastic control cover with two screws. Keep the Electric cable and
Outdoor sensor cable in between. See Figure 9. If plastic control cover
will close not properly the wiring and cover could be damaged!
Attaching the Remote Controller Rack
Use the two screws supplied to attach the rack to the wall in the
location selected by the customer.
Please inform the customer to ensure proper operation of the
air conditioner timer program, there should be a clear "line of
sight" available at all times between the remote
controller and the air conditioner.
Ø 70mm(3")
10mm(0.5")
min.
INDOOR
OUTDOOR
2
Gently push with
the arrow direction
40 mm
(1"57')
OUTDOOR SENSOR
CABLE
ELECTRICAL
CABLE
Mount the indoor unit
1
on the mounting bracket
Fig. 3
50 mm (1"96')
Fig. 4
POWER/AIRCOND
TIMER
FILTER
RECEIVER
IR
Fig. 5
REFRIGERANT
LINES
DRAINAGE
TUBE
Fig. 6
Fig. 7

Advertisement

loading

This manual is also suitable for:

Tgl-11Tgl-15Tgl-20Tgl-25Tgl-30Dgl-9 ... Show all