Plan the Belowdecks Installation

Plan the installation of the belowdecks
equipment by using the Installation Worksheet
and following the requirements in this section:
• Multiswitch Requirements
• Installation Location Requirements
• Mounting Options
• SmartSwitch Requirements (if equipped)
• Cable Requirements
• AC Power Requirements
• Grounding Requirements
Multiswitch Requirements
Using the Installation Worksheet, plan and
record multiswitch requirements based on the
number of tuners needed. Refer to the
Installation Worksheet for details.
Installation Location Requirements
• Choose belowdecks installation locations that
are dry, well-ventilated, and away from any
heat sources or salt spray.
• Ensure the ACU mounting location(s)
provide adequate Wi-Fi reception. Do not
install in an area surrounded by metal or near
any electrical devices that emit RF noise.
• In order to use the supplied power/data
cable, the antenna must be mounted within
100 ft (30 m) of its ACU. However, you can
order a longer cable if needed – contact KVH
for details.
• If you are installing a SmartSwitch and you
wish to use the supplied PC data cable,
ACU A must be installed within 3 feet (1 m)
of the SmartSwitch. However, longer cabling
may be used – contact KVH for details.
Figure 7 ACU Dimensions
Strain Relief Bracket
Top View
19.00"
(48.26 cm)
Side View
2.63"
(6.68 cm)
(2.60 cm)
1.75"
(4.45 cm)
Front View
CONTROL UNIT
MENUS
ANTENNA
POWER
16.75"
(42.55 cm)
18.31"
(46.51 cm)
16.31"
(41.43 cm)
11.18"
(28.40 cm)
4.81"
(12.22 cm)
1.02"
4 x
ø.25"
(0.64 cm)
CHANGE
ACCEPT
EXIT
0.44"
(1.12 cm)
7