5.2 Trial Run

°ˆ
Precautions
°Ò
Power up the system 12 hours while you run it for the first time so that the shaft can be preheated in
advance;
°Ò After the main power supply is switched off, please don 't start the second trial run until the system is
powered for 2.5 hours;
°Ò If the heater is not heated, to protect the compressor, don't start the system until it is powered for 2 hours.
°Ù Check the power supply between the outdoor units and the distribution unit (it is recommended you
use a 3-phase detector).
°Ù Check the indoor units.
°Ò Check the power cable and the signal cable of each indoor unit are properly connected (the signal cable
is marked with A and B);
°Ò If the power cable is mixed with the signal cable, the circuit board might go faulty.
°Ò Although the signal cable is not marked in color, please note the color, because the signal cable features
polarity;
°Ò Check if the addresses are correctly set for the indoor units;
°Ò Address switches begin with 0;
°Ò Each indoor unit must be configured with a different address.