Burnham Water boiler Installation, Operating And Service Instructions page 22

Condensing high efficiency direct vent gas-fired hot water boiler alpine series
Table of Contents

Advertisement

iV. Venting (continued)
Table 4C: CPVC/PVC Vent & Air Intake Components (Installer Provided) required for Optional Horizontal
(Snorkel) Termination
Vent Components
3" Schedule 40 PVC Pipe x up to 7 ft. max. vertical run
4" Schedule 40 PVC Pipe x up to 7 ft. max. vertical run
3" Schedule 40 PVC 90° Elbow
4" Schedule 40 PVC 90° Elbow
3" Schedule 40 PVC Pipe x ½ ft. min. horizontal run
4" Schedule 40 PVC Pipe x ½ ft. min. horizontal run
Table 5: Clearances from Vent Piping to Combustible Material
Vent Pipe
CPVC/PVC Venting
Table 6: Vent System and Combustion air System Components
Vent System Component
Schedule 40 CPVC Pipe x 30 Inches
Schedule 80 CPVC 90° Elbow
WaRning
all condensate that forms in the vent must be
able to drain back to the boiler.
b. Vent length restrictions are based on equivalent
length of vent/combustion air pipe (total length
of straight pipe plus equivalent length of
fittings). Maximum vent/combustion air lengths
are listed in Table 7. Do not exceed maximum
vent/combustion air lengths. Table 6 lists
equivalent lengths for fittings. Do not include
vent/combustion air terminals in equivalent
feet calculations. See "Combustion Air/Vent,
Equivalent Length Work Sheet".
c. The vent termination location is restricted as per
'General Guidelines', Paragraph A, 5.
(Refer to Figure 3).
System Assembly
2.
a. Plan venting system to avoid possible contact
with plumbing or electrical wires. Start at
vent connector at boiler and work towards vent
termination.
b. Do not exceed maximum Vent/Combustion Air
length. Refer to Table 7.
22
Part
aLP080 & aLP105
number
Horizontal (Snorkel)
Termination
2
N/A
N/A
4
Supplied by
N/A
Others
2
N/A
Pipe Direction
Vertical or Horizontal
Enclosed at all Sides
Equivalent Length (Ft.)
2.5
5
3. Field Installation of CPVC/PVC Two-Pipe
Quantity
aLP150& aLP210
Horizontal (Snorkel)
Termination
1
1
2
2
1
1
Minimum Clearance To
Enclosure
Combustible Material
Combustion Air
System Component
(Parts by Others)
Pipe x 1 Ft.
Pipe x 2 Ft.
Pipe x 4 Ft.
Pipe x 5 Ft.
Elbow
Elbow
*Equivalent Feet of Pipe Based on
Standard 4" PVC Design
c. Design the Vent System to allow 3/8" of thermal
expansion per 10 feet of CPVC/PVC pipe. Runs
of 20 feet or longer that restrained at both ends
must use an offset or expansion loop. Refer to
Figure 4.
d. Follow all manufacturer instructions and
warnings when preparing pipe ends for joining
and using the primer and the cement.
Vent System Connector - Floor Mounted
Boiler Builds
Refer to Figure 5 and Steps below:
a. Position the CPVC/PVC vent connector and
gasket onto boiler rear/bottom panel and insert
vent connector inner stainless steel vent pipe into
heat exchanger vent outlet.
b. Align vent connector plate and gasket clearance
holes with rear/bottom panel engagement holes;
than, secure the connector and gasket to the
panel with six mounting screws.
aLP285 thru aLP500
Horizontal (Snorkel)
Termination
N/A
2
N/A
4
N/A
2
See Figures 2A and 2B
Equivalent
Feet of Pipe*
1
2
4
5
5
2.5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alp080Alp105Alp150Alp210Alp285Alp399 ... Show all

Table of Contents