Carrier 58RAV 170 Series Installation, Start-Up, And Operating Instructions Manual page 21

Downflow/horizontal induced-combustion furnaces sizes 050-135, series 170 and 180
Table of Contents

Advertisement

LOAD CALCULATION
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
AIR FOR COMBUSTION AND VENTILATION
____________
Unconfined Space
____________
Confined Space
VENTING
____________
NFGC (United States)
____________
NSCNGPIC (Canada)
____________
Local Codes
____________
1/4-in. Upward Slope
____________
Joints Secure
____________
See Attached Vent Table Instructions
CHECKLIST—START-UP
Gas Input Rate
____________
(Set Within 2 percent of Rating Plate)
____________
Temperature Rise Adjusted
____________
Thermostat Anticipator Setting Adjusted or
____________
Thermostat Cycle Rate (3 cycles per Hr)
CHECK SAFETY CONTROLS OPERATION
____________
Primary Limit
____________
Pressure Switches
____________
Draft Safeguard Switch
____________
Auxiliary Limit Switch(es)
CHECKLIST—INSTALLATION
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents