FIREPLaCE FRaMING
It is best to build firebox framing aFTER the appliance is set in place. Refer to the dimensions for
your fireplace on Page 7. The framing headers may rest on the top of the firebox standoffs.
The firebox may be installed directly on a combustible floor or raised on a platform of an appropri-
ate height. Do not place firebox on carpeting, vinyl, or other soft floor coverings. It may, however,
be placed on a flat wood, plywood, particle board, or other hard surfaces. Be sure firebox rests on
a solid continuous floor or platform with appropriate framing for support. No cold air should enter
room from under the firebox.
Gas Connection
A1
A2
C
Top view
Figure 3 -
Peninsula Framing
Top view
A1
A2
Peninsula & Corner
Framing Specifications
1/2" Drywall
A1
43Z\x" (1105 mm)
A2
39M\," (1013 mm)
B
41Z\," (1045 mm)
C
22C\v" (578 mm)
D
24"
(610 mm)
42D0200
Peninsula Framing
2 x 4 (Minimum)
Gas Connection
2 x 4
(Minimum)
FP2038
designer see thru framing
C
10/08
5/8" Drywall
43C\," (1102 mm)
39C\v" (1010 mm)
41Z\," (1045 mm)
22Z\x" (572 mm)
23M\," (606 mm)
FP2038
A
2
A
1
Corner Framing
FP2037
A 1
Figure 4 -
Corner Unit Framing
(Right Hand Configuration shown)
Designer Series Gas Fireplaces
C
B
2 x 4
B
(Minimum)
A 2
2 x 2
(Minimum)
7