Discharge Pump; Installation Instruction; Operation Instruction - j&a Cleo-gx User Manual

Whirlpool pedicure spa
Table of Contents

Advertisement

-
G
Discharge Pump ( Optional):
Up to 4ft @ +/- 39 sec. with 1/2" Connection to main drain
Fastner
On/Off
Switch
Clear Tubing 3/4 OD ½"ID
Rubber Gasket
Elbow
(LARGE Rubber Coupling)

Installation Instruction

1.
Make a hole ( size 1-3/8") for the On/Off switch as shown (see fig 1). Pre-
drill required.
2.
Placed a 1/8" clear hose into the rear of the switch and on/off switch into the
hole.
3.
The discharge pump kit is made to fit onto the pedicure unit. (see fig 2)
4.
Connect E-Z connector onto the drain elbow.
5.
Plug discharge pump outlet into the two minute timer outlet
6.
Plug two minute timer into the wall outlet.
7.
It is very important that tip of the clear tub remain above the water Level with
one loop as shown.
** Please cut to fit 1" Flex hose to your size**

Operation Instruction

Warning !
DO NOT RUN DRY
1.
Turn to open drain plug. 3 to 5 second for air to release from the pipe
2.
Press On/Off switch to activate timer.
3.
At any time, water drain completely from the basin. Press
On/Off switch to stop or built in two minute timer.
X
(SMALL Rubber Coupling)
Air Check Valve
Poly Insert 90 Elb ½"
3/4" PVC Pipe
TEE 3/4 X 3/4 X ½
HANNING DPO 40 - 020
LARGE Rubber Coupling
3/4" Elbow
3/4 PVC Pipe
3/4" PVC Pipe
Discharge (Drain) outlet MUST be 1/2" or 3/4"
for efficient drainage.
Check valve required
Electrical Control Box
(Located left bottom
3/4 SLIP X ½" Male Adaptor
inside of base)
3/8" clear Tube
from On/Off Switch
for Part time control box
Power Plug
to wall outlet
Pipeless Motor
Power Plug
FULL TIME
2 Min.Timer
(D.pump)
3/8" Clear Tube from on/off for D/P pump
insert into 2 Min. Timer.
Make sure to push in tightly.
1-3/8" Hole
for On/Off Switch
Figure 1
Fastner
On/Off
Switch

Advertisement

Table of Contents
loading

Table of Contents