Completing the Installation
Check the following after completing the installation.
Check the external surface and the inside of the outdoor unit.
Is there any possibility of short circuit?
Outdoor unit
Is the place well-ventilated and ensures space for service?
Is the outdoor unit fixed securely?
Installation
Check the external surface and the inside of the indoor unit.
Indoor unit
Is the place well-ventilated and ensures space for service?
Check if the center of the indoor unit is ensured and it is installed horizontally.
Is total number of connecting indoor units in the allowable range?
Are the length and the difference between the refrigerant pipes within the allowable range?
Adding refrigerant
Is the Y-joint properly installed?
Is the pipe properly insulated?
Is the quantity of the additional refrigerant correctly weighed in?
Check the drain pipe of the outdoor unit and the indoor unit.
Installing the drain pipe
Have you completed the drain test?
Is the drain pipe properly insulated?
Have you performed the earthing work 3 to the outdoor unit?
Is 2-core cable used?
Installing the wiring
Is the length of the wire is in the limited range?
Is the wiring route correct?
Setting ADDRESS
Are the ADDRESSES of the indoor and outdoor unit properly set?