INTRODUCTION Disclaimer These instructions are submitted with the implicit understanding that: 1.1.1 This manual is to guide the user of Bioclimatic Air Systems equipment in the proper installation, operation and maintenance procedures to insure maximum equipment life with efficient operation.
treatment and destroy its protective value. Always touch-up scratched surfaces prior to installation and start-up. Storage When storing equipment, care must be taken to protect electrical connections, leads and finished surfaces from moisture, and contamination. Do not store the unit outdoors. Do not store any other material on top of equipment.
APPLY IF REPAIRS, REPLACEMENTS, OR ALTERATIONS ARE MADE BY OTHERS WITHOUT THE SELLER’S PRIOR WRITTEN AUTHORIZATION. IN THE EVENT THE STATE IN WHICH THE EQUIPMENT IS INSTALLED DOES NOT PERMIT THE LIMITATION OR EXCLUSION OF IMPLIED WARRANTIES OR CONDITIONS UNDER GIVEN CIRCUMSTANCES, THE PROVISIONS OF THIS WRITTEN WARRANTY ARE IN ADDITION TO AND NOT A MODIFICATION OF THE STATUTORY WARRANTIES AND OTHER RIGHTS AND REMEDIES PROVIDED BY SUCH LAWS.
Page 6
Liebert air conditioning unit or other outside electrical service without first confirming circuit integrity and compatibility. Bioclimatic Air Systems is not responsible for interface electrical wiring or connections to the PAP. If primary service to the PAP is derived from 3-phase Y 120/208V, make absolutely certain to extend the white wire (SYS.GND) from the service distribution point to the PAP and ground it...
Ionization Tube Installation Install ionization tubes as follows: 2.3.1 Screw tubes into socket by holding the leaf spring clear of tube surface. 2.3.2 Turn tube into socket by the polycarbonate base. 2.3.3 After tube contacts base, tighten an additional 1/8 to 1/4 turn. Do not use hand tools to tighten tubes, as they will damage the glass tubes.
NOTE: Ozone is a by-product of any ionization process. When installed and operated in accordance with manufacturer instructions, the Bioclimatic Air Systems System will not generate ozone in excess of the safety standards specified by OSHA and FDA. In most cases, there will not be chemically...
SYSTEM START-UP General Before starting the System, a complete inspection should be made to ensure that all the equipment is installed for safe and proper operation. It is particularly important that the system is free of all foreign objects. Be sure all access panels are securely closed.
Page 10
The fibrous filters require periodic maintenance in order to ensure satisfactory system performance over an extended period. The filter change light indicates when the fibrous filters should be replaced. When the filter change light illuminates, the prefilter ONLY should be changed according to the procedure indicated below.
If the generator is found to be defective, contact MeadWestvaco Air Systems for further instructions. Please Note: No equipment may be returned to Bioclimatic Air Systems without written authorization. Gasket Replacement After a period of operation, the gasketing on the unit may need to be replaced. It is important to replace it only with closed cell neoprene gasketing.
Need help?
Do you have a question about the PAP SERIES and is the answer not in the manual?
Questions and answers