Summary of Contents for Bioclimatic ActiveOx Series
Page 1
Installation, Operation and Maintenance Guide ActiveOx Series OUR MISSION IMPORTANT To design and build quality engineered air cleaning systems Save this Document to provide indoor comfort, protect occupants, and ensure the for Future Reference & Bioclimatic.com reliability of critical systems and processes.
Page 2
Installation, Operation & Maintenance Guide ActiveOx Series !IMPORTANT! READ THIS BEFORE STARTING INSTALLATION. DO NOT THROW AWAY THIS GUIDE. For installation you MUST: ■ Always disconnect power to the unit before handling any of the components. ■ DO NOT connect to the power before the installation is complete and personnel are aware of the imminent operation.
Installation, Operation & Maintenance Guide ActiveOx Series Table of Contents 01 INTRODUCTION 1.1 Disclaimer 1.2 Receiving 1.3 Storage 1.4 Warranty 02 PHYSICAL DESCRIPTION & THEORY OF OPERATION 2.1 Principle of Operation 2.1.1 ActiveOx Generator Bi-Polar Ionization Unit 2.1.2 System Regulation 2.1.3 Building Management System Control (BMSC)
1.1 Disclaimer These instructions are submitted with the implicit understanding that: 1. This manual is to guide the user of Bioclimatic Air Systems (B.A.S.) equipment in the proper installation, operation, and maintenance procedures to insure maximum equipment life with efficient operation.
Installation, Operation & Maintenance Guide ActiveOx Series 1.4 Warranty The seller warrants the equipment against defective workmanship and material for fifteen (15) months from date of factory shipment or one (1) year from commissioning, whichever occurs first. In the fulfillment of its warranty, the sole obligation of seller shall be to repair or replace, at its option, F.O.B.
2.1 Principle of Operation The ActiveOx Series ionization generator rail is designed specifically for plenum mounting. Generator rails are normally installed in the supply air side of an air handling unit following the final filter. Alternatively, they can be installed in the return plenum.
Installation, Operation & Maintenance Guide ActiveOx Series 03 INSTALLATION 3.1 Initial Setup Generator rails are normally installed in the supply air side of an air handling unit following an air filter. Alternatively, they can be installed in the return plenum. A minimum MERV 8 rated prefilter is required.
Installation, Operation & Maintenance Guide ActiveOx Series 04 OPERATION To start the generator rail(s), it is necessary to provide the appropriate supply voltage. The blue LEDs on the individual ActiveOx generator modules will illuminate when energized. The BMS (BAS) DB-9 connector use is optional. To turn off the system – turn the power switch to the “Off”...
Installation, Operation & Maintenance Guide ActiveOx Series 07 SPECIFICATIONS 7.1 Electrical Power Requirement: 10 VDC +/- 10% Power Consumption: 0.5 Watts Max Operating Temperature: + 70° C Humidity Range: 0 - 93% non-condensing 7.2 Mechanical See Appendices at the end of this document.
Installation, Operation & Maintenance Guide ActiveOx Series 09 PRODUCT NUMBERS* ActiveOx Ionizers *If your specific model is not listed please contact the factory at: 1-800-394-3458 for operating instructions, safety information and replacement parts or service. 1-800-394-3458 003-OCT-2021 Bioclimatic.com...
Need help?
Do you have a question about the ActiveOx Series and is the answer not in the manual?
Questions and answers