Carrier 58DXT Operating Instructions Manual page 8

Downflow 2-speed, 2-stage, induced-combustion gas furnace
Table of Contents

Advertisement

FURNACE
(OR COIL CASING
WHEN USED)
COMBUSTIBLE
FLOORING
DOWNFLOW
SUBBASE
SHEET METAL
PLENUM
FLOOR
OPENING
Fig. 6—Furnace, Plenum, and Subbase Installed on
a Combustible Floor
Never purge a line into a combustion chamber. Never use
matches, candles, flame, or other sources of ignition to check
for gas leakage. Use a soap-and-water solution to check for
gas leaks. A failure to follow this warning could result in fire,
explosion, personal injury, or death.
Table 4—Maximum Capacity of Pipe*
NOMINAL
INTERNAL
IRON PIPE
DIAMETER
SIZE (IN.)
(IN.)
1/2
0.622
3/4
0.824
1
1.049
1-1/4
1.380
1-1/2
1.610
* Cubic ft of gas per hr for gas pressures of 0.5 psig (14-in. wc) or less, and a
supply line pressure drop of 0.5-in. wc (based on a 0.60 specific gravity gas).
Ref: Table 10-2, NFPA 54-1996.
Piping should be pressure tested in accordance with local and
national plumbing and gas codes before furnace has been attached.
If test pressure exceeds 0.5 psig (14-in. wc), the gas supply pipe
must be disconnected from furnace and capped before pressure
test. If test pressure is equal to or less than 0.5 psig (14-in. wc),
turn off electric shutoff switch located on the gas valve before test.
It is recommended that ground joint union be loosened before
pressure testing.
Joint compounds (pipe dope) should be applied sparingly and only
to male threads of joints. This pipe dope must be resistant to action
of propane gas.
Install accessible manual shutoff valve upstream of furnace gas
controls and within 72 in. of furnace. A 1/8-in. NPT plugged
tapping is provided on gas value for test gage connection.
Installation of additional 1/8-in. NPT plugged tapping, accessible
LENGTH OF PIPE (FT)
10
20
30
40
175
120
97
82
360
250
200
170
680
465
375
320
1400
950
770
660
2100
1460
1180
990
A96285
Fig. 7—Furnace, Plenum, and Coil Assembly or Coil
Box Installed on a Combustible Floor
INSTALLATION
POSITION
OF FILTERS
RETURN-AIR
50
73
151
285
580
900
ACCESS DOOR
Fig. 8—Downflow Filter Arrangement
for test gage connection, installed immediately upstream of gas
supply connection to furnace and downstream of manual shutoff
valve is not required. Place ground joint union between gas control
manifold and manual shutoff.
8
FURNACE
CD5 OR CK5
COIL ASSEMBLY
OR KCAKC
COIL BOX
COMBUSTIBLE
FLOORING
SHEET METAL
PLENUM
FLOOR
OPENING
AIRFLOW
PLENUM
A96284
A88486

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents