Carrier 58DXT Operating Instructions Manual page 23

Downflow 2-speed, 2-stage, induced-combustion gas furnace
Table of Contents

Advertisement

LOAD CALCULATION
________
Heating Load (Btuh)
________
Cooling Load (Btuh)
________
Furnace Model Selection
AIR FOR COMBUSTION AND VENTILATION
________
Unconfined Space
________
Confined Space
VENTING
________
NFGC (United States)
________
NSCNGPIC (Canada)
________
Local Codes
________
1/4-in. Upward Slope
________
Joints Secure
________
See Attached Vent Table Instructions
CHECKLIST—INSTALLATION
________
________
________
________
________
________
________
________
23
CHECKLIST—START-UP
Gas Input Rate
(Set Within 2 percent of Rating
Plate)
Temperature Rise Adjusted
Thermostat Anticipator Setting Ad-
justed or
Thermostat Cycle Rate (3 Cycles per
Hr) Selected
CHECK SAFETY CONTROLS OPERATION
Primary Limit
Pressure Switches
Draft Safeguard Switch
Auxiliary Limit Switch(es)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents