Note - To mount the boiler on the wall, a two person lift will be needed.
1.0

UNPACKING

The appliance is delivered in three cartons.
1.1
The large carton contains the boiler, and the Installation/Servicing and Users Instructions.
1.2
The second carton contains the valves, fixing bolts and flue bend.
1.3
The third carton contains the flue assembly.
When the cartons are unpacked examine for any signs of damage in transit. All protective plastic should be left
in place until installation is complete.
2.0
PREPARING APPLIANCE FIXING (Rear Flue Applications)
2.1
Select the boiler location carefully ensuring that all requirements given in previous text are satisfied.
Fig. 10 will give guidance to fixing dimensions.
2.2
Mark position of flue centre and boiler fixing holes as shown in figure 10.
2.3
Carefully cut the circular flue hole. (118 mm minimum diameter).
2.4
Using a 8 mm drill, drill 60 mm deep holes to accept fixing wall bolts and insert these.
2.5
Tighten fixings until secure then remove nuts leaving fixing bolts protruding from wall.
N.B.- If the wall to be used is of a material or construction that a firm fixing cannot be obtained with the fixing bolts
supplied use alternative fixings.
3.0
PREPARING APPLIANCE FIXING (Side Flue Applications)
3.1
Select the boiler location carefully ensuring that all the requirements given in previous text are satisfied.
Fig. 10 will give guidance.
3.2
Mark position of flue centre and fixing bolts as shown in figure 10.
3.3
Carefully out the circular flue hole. (118 mm minimum diameter).
3.4
Fit fixing wall bolts for boiler as explained in 2.4 and 2.5.
N.B.- If the wall to be used is of a material or construction that a firm fixing cannot be obtained with the fixing bolts
supplied use alternative fixings.
4.0
PREPARING BOILER (standard carton)
4.1
Place the boiler on its back.
4.2
Remove the boiler base plate, four screws (fig. 16). Remove the plugs fitted to the boiler water connections.
Remove the bag of sealing washers from the boiler pipe work.
4.3
From left to right fit gas cock and water valves as follows (fig. 11) using appropriate washer.
22 mm Gas Cock (Yellow handle) Position 2
15 mm Domestic Hot Water Outlet Position 3
15 mm Domestic Cold Water Inlet (Blue handle) Position 4
22 mm Central Heating flow (Blue handle) Position 6
22 mm Central Heating Return (Blue handle) Position 7
for 15 mm Safety Valve connection (see 5.0)
N.B.: Before the gas inlet to the boiler there must be at least 100 mm of straight before any bends.