Vent Termination Locations - Intertek Tasman 40000 insert Operating & Installation Instructions Manual

Table of Contents

Advertisement

Figure 21
Letter
Minimum Clearance
A
B
C
D
E
F
G
H
3' (91 cm) within a height of 15' (4.5 m)
above the meter/regulator assembly
I
J
K
L

VENT TERMINATION LOCATIONS

24" (60 cm)
48" (122 cm)
24" (60 cm)
24" (60 cm)
24" (60 cm)
12" (30 cm)
12" (30 cm)
3' (91 cm)
12" (30 cm)
24" (60 cm)
7' (2.13 m)
Description
Above grass, top of plants wood, or any other
combustible material.
From beside/below any door or window that may be
opened.
From any door or window that may be opened.
To any adjacent building, fence and protruding parts
of the structure.
Below any eave or roof overhang.
To outside corner.
To inside corner, combustible wall.
To each side of center line extended above natural
gas or propane meter/regulator assembly or
mechanical vent.
From any forced air intake or other appliance.
Clearance to non-mechanical air supply inlet to
building, or the combustion air inlet to any appliance.
Clearance above roof line for vertical terminations.
Clearance above paved sidewalk or paved driveway
located on public property.
29

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Intertek Tasman 40000 insert

This manual is also suitable for:

Tasman 40000 free standing

Table of Contents