(7) Maximum Length of Pipe and Freon Extra Charge
Charge amount per 1m
Capacity
(Btu/h)
~7000
~9000
~12000
~18000
~24000
INDOOR UNIT
INDOOR UNIT
** A, B mean indoor unit higher located than outdoor unit.
C, D mean outdoor unit higher located than indoor unit.
CAUTION: Capacity is based on standard length and maximum allowance length is on the
basis of reliability. Oil trap should be installed every 5~7 meters (16.4~23.0ft).
STANDARD
LENGTH(m)
A
7.5
7
7.5
7
7.5
7
7.5
10
7.5
15
B(Length)
A(Height)
C(Height)
D(Length)
CONNECTION TYPE
B
C
D
15
7
15
15
7
15
15
7
15
20
10
20
30
15
30
OUTDOOR UNIT
Installation
Charge am't(g)
per 1m
20
20
20
20
30
Service Manual 57