Electrical Connection; Oil Supply - Delta FV 35 Installation, Operating And Servicing Instructions

Performance ventouse fv
Table of Contents

Advertisement

INSTALLATION

ELECTRICAL CONNECTION

Power supply
The boiler operates with a 230 V - 50 Hz single phase supply.
An on-off mains switch box with 6 A fuses must be fitted outside the
boiler to allow power to be shut off during servicing and before any
repairs are carried out on the boiler.
Conformity
Boiler installation must comply with the prevailing local technical
standards and legislation.
Safety
The stainless steel tank must be earthed separately.
The power to the boiler must be switched off before
any work is carried out.
Boiler electrical wiring
1.
Control thermostat (60/90 °C)
2.
On/off switch
3.
Summer/winter selector
4.
Safety thermostat (103 °C max.)
5.
Boiler power connection
6.
Heating circulator connection
7.
Burner connection
8.
Room thermostat
9.
Cut-off thermostat (95 °C)
10.
Boiler power plug
B.
Blue
Br.
Brown
Gr.
Green
Or.
Orange
R.
Red
Y/Gr.
Yellow / Green
BMV1 and BMV2 oil burner electric wiring
(see illustration P)
The burner is supplied with power by a 3-core cable, to be plugged
into the connector situated on the burner. Instructions for connection
are given in the burner technical manual.
A1.
Automatic igniting device
M.
Burner motor
QRB.
Photoelectric resistor
OH.
Heater
Z.
Transformer
BV1.
Magnetic valve
X1.
Burner Euro plug connector
X2.
Boiler plug connector
B.
Blue
Br.
Brown
Bk.
Black
W.
White
Y/Gr.
Yellow / Green
EN
8
(see illustration A)

OIL SUPPLY

System construction and installation must be in accordance with
DIN 4755. Local regulations must be followed.
Oil pipes must be brought sufficiently close to the burner so that the
tubes can be connected without strain. On the aspiration side of the
line, fit a filter with a quick closing valve. Install a check valve on the
return line.
The Burner can operate with a 1 or 2 line system.
In series, the burner is designed to operate with a two-line system.
The vacuum in the aspiration line should not exceed 0.4 bar.
Refer to the ACV BMV1 and BMV2 burner manual
supplied with them.
Single-line installation
(see illustration I)
Height H
Ø 6 mm
4.0 m
100 m
3.5 m
100 m
3.0 m
100 m
2.5 m
100 m
2.0 m
100 m
1.5 m
197 m
1.0 m
165 m
0.5 m
132 m
Nozzle
uo to 2.5 Kg
Dual-line installation
(see illustration J)
Height H
Ø 6 mm
0.0 m
17 m
0.5 m
15 m
1.0 m
13 m
1.5 m
11 m
2.0 m
19 m
2.5 m
17 m
3.0 m
15 m
3.5 m
13 m
Ø 6 mm
Ø 8 mm
100 m
100 m
100 m
100 m
197 m
100 m
181 m
100 m
165 m
100 m
149 m
177 m
132 m
151 m
116 m
126 m
uo to 5.0 Kg
uo to 10.0 Kg
Ø 8 mm
Ø 10 mm
53 m
100 m
47 m
100 m
41 m
199 m
34 m
184 m
28 m
168 m
22 m
153 m
15 m
137 m
19 m
122 m