NCR 7448 Workstation Site Preparation Manual page 3

Hide thumbs Also See for 7448 Workstation:
Table of Contents

Advertisement

Preface
Safety Warnings
Audience
This is a contractual document. It contains important warnings and confers
important legal rights and obligations. You are advised to read it carefully.
It is the responsibility of the customer to ensure that all installation preparations
are complete and in compliance with NCR specifications and requirements and
all applicable national, state, or local codes, regulations, and laws.
The NCR 7448 Workstation must be connected to an AC outlet that is near the
workstation and is easily accessible by the operator.
Warning: This unit contains hazardous voltages and should only be
serviced by qualified service personnel.
The power switch is a logic switch only. The AC line voltage primaries are live
at all times when the power cord is connected. Therefore, disconnect the AC
power cord before opening the unit to install features or service this
workstation.
Site Preparation i

Advertisement

Table of Contents
loading

Table of Contents