Download Print this page

Dell Networking N4000 Series Getting Started Manual page 19

Highly scalable, non-stop networking switches for campus aggregation and core switching 10 gbe deployments
Hide thumbs Also See for Networking N4000 Series:

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
3 Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws.
See Figure 4, item 3.
4 Repeat this procedure for the second rail.
Two-post Center-mount Configuration
1 Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws.
See Figure 5, item 1.
Figure 5. Two-post Center-mount Configuration
2 Slide the back bracket towards the post and secure it to the post flange
with two user-supplied screws. See Figure 5, item 2.
3 Repeat this procedure for the second rail.
Four-post Threaded Configuration
1 For this configuration, the flange ear castings must be removed from each
end of the ReadyRails assemblies. Use a Torx driver to remove the two
screws from each flange ear and remove each casting. See Figure 6,
item 1 on page 18. Retain the castings for future rack requirements.
Installation
17

Hide quick links:

Advertisement

loading