HP ProLiant DL38 Setup And Installation Manual page 34

Generation 3 packaged cluster
Hide thumbs Also See for ProLiant DL38:
Table of Contents

Advertisement

1. Locate the following materials necessary for installing the storage system.
Table 5-1: Rack-Mounting Hardware and Template
Item
Description
1
Rack rail (left)
2
Rack rail (right)
3
Pins for round-hole rack conversion
4
4U rack template
IMPORTANT: Install the storage system in the rack, leaving enough space above to install
the servers. The following procedure details installation in a square-hole rack. For installation
procedures concerning round-hole racks, refer to the HP StorageWorks Modular Smart Array
500 System User Guide on the Documentation CD.
HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide
Setup and Installation in a Rack
5-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl38 g3

Table of Contents