Williamson-Thermoflo GWC-070 Manual page 63

Gas-fired water boilers
Hide thumbs Also See for GWC-070:
Table of Contents

Advertisement

GWC
-
gas
fired water boiler
Start-up
(continued)
Integrated boiler control (IBC) sequence of operation — status light indications
Figure 71
STEPS
(After Step 8, the cycle goes back to Step 1)
1. Standby
• Waiting for call for heat
2. Call for heat
• Circulator on
3. Limit circuit
• Limit controls closed
• Block switch contacts closed
• Blower on
4. Pressure circuit
• Pressure switch contacts closed
• Ignitor glows
5. Flame proven
• Gas valve open
• Ignitor remains on
6. Limit cycle
• Limit circuit open
• Gas valve closed
• Blower off after postpurge
7. Flame outage *
• Flame out
8. Thermostat satisfied
• Circulator off
• Blower postpurge
• Return to Step 1
* If flame is not proven in 4 seconds, boiler recycles 2 times to retry for ignition before going into lockout. Recycle igniter timing
is 30 seconds. Postpurge and prepurge are performed on every cycle. In event of lockout, ignition control will automatically
restore sequence of operation after either:
• 1 hour waiting period.
• Opening and closing of thermostat circuit.
• Removal of 120 VAC power for at least 45 seconds
Part number 550-142-056/0411
— Boiler Manual
POWER
TSTAT
Call for
CIRC
Heat?
NO
YES
YES
YES
YES
YES
YES
NO
LIMIT
PRESS
SWITCH
= ON
= OFF
FLAME
Timing
30 sec
6 sec
30 sec
30 sec
63

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gwc-105Gwc-140Gwc-175

Table of Contents