Goodman CVC9/95 Installation Instructions Manual page 21

Cvc9/95 & mvc95 series two-stage gas furnace
Table of Contents

Advertisement

1. Remove the rubber plug from the right side of the front
cover drain port.
2. Secure Hose A to front cover drain port with a red hose
clamp. Route hose to rear side panel grommet hole.
3. Cut and remove 1/4 inch from the end of the drain port on
the rubber elbow.
4. Insert Tube 1 into rubber elbow drain port and secure with
silver hose clamp. Angle tube outward toward front of
furnace.
FRONT
COVER
DRAIN PORT
RED HOSE
HOSE
CLAMP
Upright "Standard" Connections - Right Side
(Upflow Shown, Counterflow Similar)
5. Cut 17 3/4 inches from the long end of Hose B and
discard. Secure the remaining hose to Tube 1 with a
green hose clamp. Route the other end of Hose B to
front right side panel grommet hole.
For details concerning mounting of the drain trap, refer to Hori-
zontal Drain Trap Mounting.
6. Insert short end of each of tube 2 through side panel
grommet holes. Secure tubes to hoses A and B with
green hose clamps. Ensure hoses and tubes maintain a
downward slope for proper drainage and that they are
not kinked or binding.
GREEN
A
HOSE
CLAMPS
(3 PLACES)
21
RIGHT SIDE
PANEL
RUBBER
ELBOW
RUBBER ELBOW
DRAIN PORT
SILVER HOSE CLAMP
TUBE 1
HOSE
SIDE PANEL
B
GROMMET
HOLES
TUBE(S) 2
DRAIN
TRAP

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents