Lennox FCM 85 Installation, Operating And Maintenance page 35

Flexy & flexy wshp series
Table of Contents

Advertisement

ENERGY RECOVERY INSTALLATION
1)
The unit being already erected on the roofcurb, remove the lifting lug shown on
[B]
module
.
2)
Fit the support part of the Recovery Module on interior level of the rooftop
3)
Fix the Recovery Module at the roof of the rooftop
4)
Apply Mastic on side junctions and on higher junction.
Pictures taken during assembling test of Recovery Module (H Size)
FLEXYII_WSHP-IOM-0909-E
zoom
1
2
[A]
, and the doors of the Recovery
1
,
3
and corner structures
zoom
2
Fig. 25
zoom
3
by using self-driling screws.
Page 33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents