INSTALLATION INSTRUCTIONS MODELS EHP323-A05 EHP323-A10 EHP323-A15 EHP323-B09 EHP323-B15 OPTIONAL ELECTRIC HEAT PACKAGES For Use With 2, 2½ and 3 Ton Package Units Bard Manufacturing Company, Inc. Manual : 2100-472A Supersedes: 2100-472 Bryan, Ohio 43506 File: Volume II Tab 12 Since 1914 . . . Moving ahead, just as planned.
Page 2
Figure 1 Unit Modification ........4 Shipping Damage ............3 Figure 2 Installation & Wiring ........ 4 Unpacking The Heat Package ........3 Installation ..............3 Wiring Connections ........... 3 BARD MANUFACTURING COMPANY, INC. BRYAN, OHIO USA 43506 Manual 2100-472A Page 2 of 4...
IMPORTANT WIRING CONNECTIONS The equipment covered in this manual is to be installed by Connect the wires exiting the bottom of the heater package trained, experienced service and installation technicians. into the unit circuit by plugging in the plastic snap lock fitting into the mating fitting located on the rear of the control panel.
Page 4
FIGURE 1 UNIT MODIFICATION Remove Blank Off Plate Remove Cover FIGURE 2 INSTALLATION & WIRING Use (4) screws to attach heater package Route heater power wires Plug male 6 pin connector into field installed term. block from heater into 6 pin plug in as shown.