Worcester C1 Installation And Servicing Instructions page 3

Wall mounted combination boiler for central heating and mains fed domestic hot water
Table of Contents

Advertisement

Fig. 1. Facia controls
Central Heating
Indicator
Power ON
Reset
Light
Indicator
Button
!
0
I
Mains
Central Heating
ON/OFF
Operation and
Switch
Temperature
Control Knob
2.7 System
All dirt must be flushed from the system before
connecting the appliance.
The system can be pre-piped and flushed before the appliance is
fitted.
The connections in the system must withstand a pressure of
upto 3 bar.
Radiator valves must conform to BS2767: 10:1977.
Table 3 gives the pump head available for the system and the
required temperature differential.
A drain cock must be fitted to the lowest point and an air vent to
the highest point of the system.
2.8 Showers, Bidets, Taps and Mixing Valves
All taps and mixing valves must be suitable for the available
mains pressure and temperatures up to 65°C. It may be
necessary to fit a pressure reducing valve.
Hot and cold mains fed water can be supplied to overrim bidets
but is subject to local water company requirements.
The flow of water from individual outlets varies on all mains fed
systems that are not fitted with flow balancing valves. If a
pressure equalising valve is fitted then the domestic hot water
temperature should be set to maximum.
Thermostatically controlled shower valves give extra comfort
and protection.
2.9 Safety
The appliance must not be operated with the inner casing cover
removed.
The gas and electricity supplies must be turned off before
working on the appliance.
Temperature monitoring controls are fitted to prevent overheating.
Automatic frost protection is provided together with automatic
pump seizure protection.
The gas valve solenoids are automatically checked for gas
soundness.
IMPORTANT: Where back-flow prevention devices, including
water meters, are fitted the expansion of hot water into cold
water main can be prevented. This can result in a pressure
build-up that may cause damage to the boiler and household
devices such as showers, washing machines etc.
In these cases we recommend that a mini-expansion vessel
be fitted adjacent to the boiler in the cold water pipe.
2.10 Operation
Central Heating
A demand for heat will ignite the burner. It will operate at
minimum pressure for 2 minutes before increasing to the
maximum pressure over a period of 1 minute and then
automatically match the system requirements. At the end of the
demand the burner will go out, the pump will continue to run for
up to 4 minutes or the fan for 35 seconds. There is an anti-cycle
time of 3 minutes.
Domestic Hot
Burner
Water Indicator
Operation Light
Light
Domestic
Hot Water
Pressure
Temperature Control
Knob
Domestic Hot Water
A demand for hot water will ignite the burner. The burner
pressure will immediately rise to maximum.
At the end of the demand the fan will continue to run for 35
seconds if there is no heating demand.
The demand for hot water will override the CH function. In winter
it may be necessary to reduce the flow at the taps to maintain
the delivery temperature.
Fig. 2. Water flow diagram.
System
Gauge
12
1. CH Flow.
2. Domestic Hot Water
Supply.
3. Domestic Cold Supply.
4. CH Return.
5. Relief Valve Discharge.
6. Relief Valve.
3
11
1
2
3
4
7. Domestic Water Flow
Switch.
8. Pump.
9. Sealed System
Expansion Vessel.
10. Bi-thermal gas to water
Heat Exchanger.
11. Automatic Air Vent.
12. Fixed By-Pass.
10
9
8
7
6
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents