Installation Diagram - York MHC-MHH Installation Manual

Minisplit high wall
Table of Contents

Advertisement

INSTALLATION DIAGRAM

60 cm or more
Auto louver (vertical)
Manual louver (horizontal)
8
HIGH WALL
10 cm or more
70 cm or more
Vinyl tape
Apply after carrying out a drainage
test.
* To carry out the drainage test,
remove the air filters and pour
water into the heat exchanger.
Connecting cable
Additional drain hose
Liquid side piping
Gas side piping
Vinyl tape
Installation plate
60 cm or more
Remove the cover plate screw
to have access to the terminal
board.
20 cm or more
60 cm or more

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents