Download Print this page

S9 Antennas S9v Installation Manual page 18

18’ mk ii multiband vertical antenna
Hide thumbs Also See for S9v:

Advertisement

_____________________________________________________________________________
n. To retrieve the vertical element wire from the antenna, use the hook tool to
fish the rubber band loop out of the exit hole in the side of the base tube
(as shown below). Once the tip of the connector is close to the exit hole,
remove the hook tool and use your fingers to bring the connector through
the hole.
o. Now, remove the rubber band from the tip of the connector and connect
the male connector to the female connector on the provided lower wire
segment.
p. Before we raise the antenna, remove the center piece from the screw on
cap and put it in your pocket. Now, screw the ring back onto the bottom of
the base tube. The ring will protect the base tube bottom cap threads
while the antenna is deployed and it also creates a drain path for any
moisture that accumulates inside the fiberglass sections.
2. Screw plastic ring back
onto bottom of base
tube
________________________________________________________________________
S9v 18' M k II Installation Guide
1. Remove cap center piece
18

Advertisement

loading

Related Products for S9 Antennas S9v