Madrigal Imaging MP8 Instruction Manual

Crt installation
Hide thumbs Also See for MP8:

Advertisement

Quick Links

Hi-Rez Projections Inc.
20 Main St.
Ashland, MA 01721
508-881-1613
www.hometheater1.com
MP8
CRT Installation

Advertisement

Table of Contents
loading

Summary of Contents for Madrigal Imaging MP8

  • Page 1 Hi-Rez Projections Inc. 20 Main St. Ashland, MA 01721 508-881-1613 www.hometheater1.com CRT Installation...
  • Page 2: Table Of Contents

    CAUTIONS Before Beginning ..............2 Tools Required ..................2 Procedure ....................3 CRT A ..............3 NPACKING SSEMBLY CRT A ...............3 EMOVING THE SSEMBLY CRT A ...............4 NSTALLING THE SSEMBLY Supplemental Information ..............5 ) ............5 LIGNMENT OF OTATION IF NEEDED Table of Contents MP8 CRT Installation...
  • Page 3: Overview

    Overview This procedure will allow a qualified Madrigal Imaging dealer to install a CRT into a MP8. Please read and understand all instructions outlined in this procedure before attempting the installation. Should you have questions about this procedure please contact the Madrigal Technical Services Department.
  • Page 4: Cautions Before Beginning

    Be careful when handling metal as it scratches easily. Place a soft towel under unit while doing repair. Tools Required • Ball Nose Screwdriver (Supplied With Projector) • Needle Nose Pliers • Philips head screwdriver Page 2 MP8 CRT Installation...
  • Page 5: Procedure

    See Diagram 1 for Top Plate bolt locations. These bolts are labeled A – B – C – D in the diagram. Diagram 1 – CRT Securing Bolt Locations Page 3 MP8 CRT Installation...
  • Page 6: Installing The Crt Assembly

    6. Inspect the completed projector for proper lead dressing and uninstalled plugs. 7. Reattach all covers on the Projector (Left and Right Side Shield panels, Upper Left and Right Side panels, Rear panel, Front and Rear Top Covers). Page 4 MP8 CRT Installation...
  • Page 7: Supplemental Information

    Place a dab of hot melt on CRT and Yoke to insure that the deflection yoke does not move. • Reattach the top plastic shield. NOTE: Upon completion, a full optical alignment may be required. Page 5 MP8 CRT Installation...
  • Page 8 10/2000 Rev 1.0 Document # MI10400 WB-PN / FB-DW...

Table of Contents