Vaillant Vantage 120 Installation Instructions Manual page 4

Unvented hot water storage cylinders for use with vaillant boilers
Table of Contents

Advertisement

1 Description
4
Note To Installers
This product has been assessed and found to comply
with the requirements of the Building Regulations for
unvented hot water storage systems and must not be
altered or modified in any way.
The installation must be carried out by a competent per-
son and be in accordance with the relevant require-
ments of the Local Authority, Building Regulations,
Building Standards (Scotland) Regulations and the bye-
laws of the local Water Undertaking. The installation is
subject to Building Regulation approval, notify the Local
Authority of intention to install. In the event of parts
replacement, use only genuine spare parts supplied by
Vaillant Ltd.
Check that the cylinder has been supplied with the follo-
wing:
– Packed inside cylinder carton
Tundish, cylinder drain valve,
appliance top cover (including
operating thermostat), functional water controls pack,
installation and user instructions.
– Packed in separate carton
Expansion vessel (12 litre for
VANTAGE 120/150, 18 litre for VANTAGE 200).
Prior to installation, ensure that the VANTAGE cylinder
is stored upright in dry conditions. The VANTAGE must
be kept upright during transportation.
Please also refer to "General Requirements" in the
installation instructions supplied with the Vaillant boiler.
Vaillant Vantage 120/150/200

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vantage 150Vantage 200

Table of Contents