Installation Instructions - Qasair FA Installation Instructions Manual

Fa / mt / mc / uch / uv / ndch / ech / h / pyr / 3f / sf / st / maj / in / sta / smf / fas / tr ct / brh / bar / 4f / vis / pre / d 400 / d 500 / sq 420 / fpr / ma /ham / bur series ventilation hood
Table of Contents

Advertisement

14
QASAIR Installation Instructions

installation instructions

Remove canopy and flue from boxes and check you have correct model and flue.
1.
Locate centre point of stove.
2.
Use level or plumb line to mark centre up to ceiling.
3.
Mark level line for base of canopy 700-800mm above bench 750mm desirable.
4.
Check roof space above for wires and obstructions as now is the time to decide on any changes to
5.
location due to immovable obstructions.
Mark flue size on ceiling and cut neat exact hole to pass flue through.
6.
For rear ducted models cut hole in wall for vent to pass through.
7.
Fix mounting bracket to wall at desired height.
8.
Remove fan(s) from canopy by removing side fixing bolts and disconnecting electrical plug at flexible
9.
connector.
Locate solid fixing points on wall and drill holes in rear of canopy to suit. If no solid fixing is available
10.
then now is the time to install fixing points. Four points are recommended with one on each side at
top and one on each side at bottom.
Drill hole in rear of unit to pass power connection through where available on wall.
11.
Check flue slides through hole in ceiling.
12.
Place canopy flat on floor and fit stainless flue over spigot pushing all the way down for a neat fit.
13.
Drill hole in rear of flue and fix to canopy with pop rivet or screw.
Carefully lift canopy into position, guiding flue through ceiling and feeding power cable through hole
14.
in rear of canopy. Make sure canopy is sitting correctly on mounting bracket then fix to wall through
fixing holes with solid screws. (You may need to place a packer behind canopy if wall is bowed to
make the canopy sit correctly).
Complete electrical connection to 10 AMP junction box to local electrical authority regulations
15.
ensuring power is turned off during work.
Fit ducting to outside or exterior wall vent for rear ducted models. (Seal rear vents onto rear of hood
16.
with silicone). A plumber should seal roof penetration with appropriate flashing. All joins in ducting
need to be sealed with duct tape or silicone and only use approved ducting of the correct size for
your canopy.
Fit motor(s) back into canopy with fixing bolts and plug electrical connector in.
17.
Test run hood.
18.

Advertisement

Table of Contents
loading

Table of Contents