Part 3 - Transfer Switch - Generac Power Systems 7 kW NG Repair Manual

Standby generator air-cooled product with nexus control, 7 kw ng, 8 kw lp, 9 kw ng, 10 kw lp, 13 kw ng, 14 kw lp, 15 kw ng, 15 kw lp, 16 kw ng, 17 kw lp, 18 kw ng, 20 kw lp
Hide thumbs Also See for 7 kW NG:
Table of Contents

Advertisement

PART 3
TRANSFER SWITCH
Air-cooled, Automatic
Standby Generators
Section 3.1 - Description and Components ....................... 60
Introduction .......................................................... 60
Enclosure ............................................................. 60
Transfer Switch Contactor ..................................... 61
Transfer Relay ....................................................... 61
Neutral Lug ........................................................... 62
Manual Transfer Handle ........................................ 62
Customer Connections ......................................... 62
Fuse Holder .......................................................... 63
Section 3.2 - Operational Analysis .................................... 64
Utility Source Voltage Available.............................. 64
Utility Source Voltage Failure ................................. 65
Transferring to Standby ......................................... 66
Transferred to Standby .......................................... 67
Utility Restored ..................................................... 68
Section 3.3 - Troubleshooting Flowcharts ......................... 73
Introduction .......................................................... 73
Problem 6 - In Automatic Mode,
No Transfer to Standby ...................... 73
Problem 7 - In Automatic Mode, Generator Starts
When Loss of Utility Occurs,
Generator Shuts Down When Utility
Returns, but There Is No Retransfer
to Utility or Generator Transfers to
TABLE OF CONTENTS
SECTION TITLE
3.1
Description and Components
3.2
Operational Analysis
3.3
Troubleshooting Flow Charts
3.4
Diagnostic Tests
Problem 8 - Unit Starts and Transfers When
Utility Power is Available ................... 74
Problem 9 - Blown F1 or F2 Fuse .......................... 74
Problem 10 - Blown T1 Fuse ................................ 74
Section 3.4 - Diagnostic Tests .......................................... 76
Introduction .......................................................... 76
Safety ................................................................... 76
Transfer Switch Troubleshooting .......................... 76
Switch Operation ................................... 77
Test 22 - Check 23 and 194 Circuit ...................... 78
Test 23 - Test Transfer Relay ................................ 79
Test 25 - Check Wire 23 ....................................... 81
Test 26 - Utility Control Circuit ............................. 83
Test 27 - Test Limit Switches ................................ 83
Test 28 - Check Fuses F1 and F2 .......................... 84
Test 29 - Check Fuse F3 ...................................... 84
Test 30 - Check Main Circuit Breaker .................... 84
Test 32 - Check N1 and N2 Wiring ........................ 85
Test 33 - Check N1 and N2 Voltage ...................... 85
at the Circuit Board ................................ 86
Test 36 - Check T1 Wiring .................................... 86
PAGE
60
64
73
76
Page 59

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8 kw lp10 kw13 kw14 kw15 kw16 kw ... Show all

Table of Contents