AC conduit and wiring
Connect the main 240 Volt AC-breaker box to the Sunny Boy by a 1/2" conduit.
Insert the conduit fitting in the very right opening of the Sunny Boy. Fasten the
fitting on the inside of the Sunny Boy with the nut.
Pull the wires through the conduit into the interior of the Sunny Boy.
Connect the wire L1 to the terminal labeled L in the Sunny Boy (see Fig. 2.8).
Connect the wire L2 to the terminal labeled N in the Sunny Boy.
Connect the equipment-grounding conductor to the terminal labeled PE in the
Sunny Boy.
Torque wires with torque of 35 in-lb.
Ensure all connections are correctly wired and properly torqued.
SB2500U-11:NE
http://www.wholesalesolar.com/inverters.html
L1
Fig. 2.8: AC connection socket
17
-
-
http://www.wholesalesolar.com/inverters.html
Installation and Operator's Manual
L2
Ground
SMA Regelsysteme GmbH

Advertisement

Table of Contents
loading

Related Products for Sunny Boy SWR 2500U

Table of Contents