Start-Up Checklist - Carrier Aquazone 50PEC09-18 Installation, Start-Up And Service Instructions Manual

Water source heat pumps console unit with puron refrigerant (r-410a)
Table of Contents

Advertisement

CUSTOMER:___________________________
MODEL NO.:___________________________
I. PRE-START-UP
DOES THE UNIT VOLTAGE CORRESPOND WITH THE SUPPLY VOLTAGE AVAILABLE? (Y/N)
HAVE THE POWER AND CONTROL WIRING CONNECTIONS BEEN MADE AND TERMINALS
TIGHT? (Y/N)
HAVE WATER CONNECTIONS BEEN MADE AND IS FLUID AVAILABLE AT HEAT EXCHANGER?
(Y/N)
HAS PUMP BEEN TURNED ON AND ARE ISOLATION VALVES OPEN? (Y/N)
HAS CONDENSATE CONNECTION BEEN MADE AND IS A TRAP INSTALLED? (Y/N)
IS AN AIR FILTER INSTALLED? (Y/N)
II. START-UP
IS FAN OPERATING WHEN COMPRESSOR OPERATES? (Y/N)
UNIT VOLTAGE — COOLING OPERATION
PHASE AB VOLTS
PHASE AB AMPS
CONTROL VOLTAGE
IS CONTROL VOLTAGE ABOVE 21.6 VOLTS? (Y/N)
IF NOT, CHECK FOR PROPER TRANSFORMER CONNECTION.
TEMPERATURES
FILL IN THE ANALYSIS CHART ATTACHED.
COAXIAL HEAT
COOLING CYCLE:
EXCHANGER
WATER IN
HEATING CYCLE:
WATER IN
AIR COIL
COOLING CYCLE:
AIR IN
HEATING CYCLE:
AIR IN
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53500102-01
50PEC UNIT

START-UP CHECKLIST

JOB NAME: _______________________________________
SERIAL NO.:______________ DATE:
F WATER OUT
F WATER OUT
F AIR OUT
F AIR OUT
Printed in U.S.A.
Form 50PEC-3SI
.
F
ft wg
F
ft wg
F
F
CL-1
8-14
______________
gpm
gpm
Replaces: NEW