Finalizing The Installation; Installing The Control Box - Travis Industries Avalon Cedar User Manual

Direct vent freestanding stove
Table of Contents

Advertisement

Installation

Finalizing the Installation

!
Turn the gas control valve to "OFF" prior to conducting any service.
1
Install the control box following the instructions below.
Place the control box in
place and secure with the
two screws.
NOTE: a tab on the back of
the control box inserts into
this slot.
Remove the wire cover by loosening
these screws and sliding it to the left.
1/4" Nutdriver
2
Open the door (see page 19). Install the log set and coals (see page 20).
!
We recommend you purge the gas line at this time (with the door open). This allows gas to be
detected once it enters the firebox, ensuring gas does not build up.
3
Close and secure the door (see page 19).
4
Turn on gas to the heater. Leak test all gas joints prior to starting the appliance. Start the pilot. Start
the main burner. Leak test all gas joints again.
5
Check the pilot flame to make sure it looks like the illustration below. Adjust the pilot flame if
necessary.
To adjust the pilot flame, turn this screw (NOTE: if totally
unscrewed gas will come out of this port). Clockwise
lowers the flame while counter-clockwise raises it.
Travis Industries
b
Phillips
Screwdriver
a
c
Replace wire cover so it conceals
the wires from the control box.
Standard
Screwdriver
4 0 3 0 2 0 6
(for qualified installers only)
The pilot flame must contact the thermocouple and
thermopile (see the illustration below). Adjust the pilot up or
down as necessary.
17
9 3 5 0 8 1 1 7

Advertisement

Table of Contents
loading

Table of Contents