Continental Girbau CG75-85 Installation Manual page 85

Gas dsi/electric/steam phase 5 and dual timer/1,000 cfm
Hide thumbs Also See for CG75-85:
Table of Contents

Advertisement

CAUTION: The dryer must be grounded. A ground lug has been provided for this purpose.
IMPORTANT: A CIRCUIT SERVICING EACH DRYER MUST BE PROVIDED.
The only electrical connections to the dryer are the 3-phase (3ø) leads (L1, L2, L3, and sometimes Neutral)
and ground.
NOTE: Electrically heated service (amperage) specifications/requirements are not available at the time
of printing. Contact factory for update.
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents