Installation; Unpacking And Inspection; Handling Precautions; Installation Of M/Ma Modules - C&H Technologies M218 User Manual

16 - channel form a switch m - module
Table of Contents

Advertisement

2.0 INSTALLATION

2.1 UNPACKING AND INSPECTION

Verify that there has been no damage to the shipping container. If damage exists then the
container should be retained, as it will provide evidence of carrier caused problems. Such
problems should be reported to the shipping courier immediately, as well as to C&H. If there is
no damage to the shipping container, carefully remove the module from its box and anti static bag
and inspect for any signs of physical damage. If damage exists, report immediately to C&H.

2.2 HANDLING PRECAUTIONS

The module contains components that are sensitive to electrostatic discharge. When handling the
module for any reason, do so at a static-controlled workstation, whenever possible. At a
minimum, avoid work areas that are potential static sources, such as carpeted areas. Avoid
unnecessary contact with the components on the module.

2.3 INSTALLATION OF M/MA MODULES

All M-Modules must be installed into the carrier before the carrier is installed into the host
system. To install a module, firmly press the connector on the M/MA-Module together with the
connector on the carrier as shown in Figure 1. Secure the module through the holes in the bottom
shield using the original screws.
CAUTION: M/MA-Module connectors are NOT keyed. Use extra caution
C&H Technologies, Inc. <> 445 Round Rock West Drive <> Round Rock, Texas 78681 <> www.chtech.com
to avoid misalignment.
module can damage the M/MA-Module and carrier.

Figure 1. M-MODULE Installation

Applying power to a misaligned
M/MA-Module
Carrier
5
Row not used
A B

Advertisement

Table of Contents
loading

Related Products for C&H Technologies M218

Table of Contents