Download Print this page

Xyron PRO 1255 XM1255 User Manual page 3

Adhesive application & laminating system

Advertisement

Setting Up
Remove the XM1255 and crank the handle from the packaging. 1. (1) 6" Piece
of Corrugate Box material [Use a piece of the supply cartridge carton flap]
2. Tools included – None required
Assembly Instructions
1. When ready to assemble the Crank Handle onto the XM1255 machine, insert
the threaded stud of the handle into the Crank side hole and rotate the handle
until the nip rollers begin to rotate.
2. Next place a folded over 6" piece of corrugate box material into the nip
rollers and apply a medium force / pressure to crank handle as shown in figure
1. Warning: Excessive force applied to the handle during this process may
cause damage to the threads of the handle. The nip roller may elevate slightly
during the handle assembly process, this is normal. DO NOT OVER TIGHTEN.
Slide inputtray out of machine
1
by pressing tabs on each side.
Input
Tray
From the input side, insert
3
starter card into machine
between the
substrates to
start material
through the
rollers. Turn the
handle of the
machine in a
clockwise direction. This will advance
the material.
Figure 1: Place the place a folded over 6" piece of
corrugate box material into the nip rollers and apply
a medium force / pressure to crank handle
Loading Supply Rolls
Press down the orange blade holder and
5
slide it in either direction to trim excess film.
With top cover open, lift
2
out used cartridge completely.
Replace cartridge
with new one.
Make sure label
is up and view-
able from top
input side of
machine.
Advance the film through the
4
machine until the film is
aligned
and wrinkle
free. This
may take 6
– 10 inches.
Reinsert the
tray. Be sure it
"snaps" into
place.

Advertisement

loading

This manual is also suitable for:

Pro 1255Xm1255