Operation Control Function By The Outdoor Controller - Mitsubishi Heavy Industries SRK20ZJ-S Technical Manual

Inverter residential air conditioners
Hide thumbs Also See for SRK20ZJ-S:
Table of Contents

Advertisement

(4) Operation control function by the outdoor controller

(a)
Defrosting operation
Starting conditions (Defrosting operation can be started only when all of the following conditions are met.)
1)
a)
After start of heating operation
When it elapsed 45 minutes. (Accumulated compressor operation time)
b)
After end of defrosting operation
When it elapsed 45 minutes. (Accumulated compressor operation time)
c)
Outdoor heat exchanger sensor (TH1) temperature
When the temperature has been below –5ºC for 3 minutes continuously.
d)
The difference between the outdoor air sensor temperature and the outdoor heat exchanger sensor temperature
¡ The outdoor air temperature ≧ 0°C : 7°C or higher
¡ -15°C ≦ The outdoor air temperature < 0°C : 4/15 × The outdoor air temperature + 7°C or higher
¡ The outdoor air temperature < -15°C : -5°C or higher
e)
During continuous compressor operation
In addition, when the speed command from the indoor controller of the indoor unit during heating operation has
counted 0 rps 10 times or more and all conditions of a), b), c) and e) above and the outdoor air temperature is 3°C or
less are satisfied (note that when the temperature for outdoor heat exchanger sensor (TH1) is -5°C or less: 62 rps or
more, -4°C or less: less than 62 rps), defrost operation is started.
Ending conditions (Operation returns to the heating cycle when either one of the following is met.)
2)
a)
Outdoor heat exchanger sensor (TH1) temperature: 13ºC or higher
b)
Continued operation time of defrosting → For more than 16 minutes and 50 seconds.
Heating operation
Models 20~35
0
-5
-10
-15
-20
-20
-15
¡Defrast operation
Max. 16 minutes and 50 seconds
Depends on an operation condition, the time can be longer than 7 minutes.
Defrost operation
start
-10
-5
0
5
Outdoor air temperature (℃)
172
-
-
'10 • SR-T-091
Model 50
0
-5
-10
-15
-20
10
-20
-15
2~7 minutes
Hot keep operation
Defrost operation
start
-10
-5
0
5
Outdoor air temperature (℃)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents