Conversion Instructions - Worcester 24ijunior Installation And Servicing Instructions

Wall mounted combination boilers for central heating and mains fed domestic hot water
Table of Contents

Advertisement

20. Conversion Instructions

ONLY COMPONENTS SUPPLIED BY WORCESTER HEAT
SYSTEMS SHOULD BE USED
ONLY COMPETENT PERSONNEL SHOULD ATTEMPT THE
CONVERSION
CONVERSION FROM NATURAL GAS TO LPG SHOULD NOT BE
CARRIED OUT ON APPLIANCES INSTALLED IN A ROOM OR
INTERNAL SPACE BELOW GROUND LEVEL
1. Ensure the gas service cock is turned OFF and the electrical
supply is ISOLATED.
2. Refer to the Servicing Instrucions to remove the cabinet front
panel and inner casing.
3. Follow the dismantling instructions to remove the burner.
Refer to Installation and Service Instructions Section: Inspection
and Servicing.
4. Remove the injector and replace with the relevent injector
from the kit. Refer to Installation and Service Instructions
Section: Inspection and Servicing.
5. Remove the nut end cap and bracket at the opposite end of
the burner and insert the gauze from the kit for NG to LPG or
remove it for LPG to NG.
6. Refit the end cap ensuring that the support bracket is in the
correct orientation.
7. Remove the gas valve and replace with the gas valve
supplied in the kit. Refer to Installation and Service Instructions
Section: Replacement of Parts.
8. Re-assemble the burner and inner-casing.
9. Turn on the gas and electricity supplies and follow the
Table 1.
24i
NOMINAL BOILER RATINGS (10 Minutes After Lighting)
BOILER ADJUSTED FOR G20 (Natural Gas)
OUTPUT
INPUT (Net)
kW
kW
3.5
9.5
23.5
25.9
BOILER ADJUSTED FOR G31 (Propane)
7.5
9.5
23.5
25.9
Natural Gas: Net Input = Gross Input x 0.901
QTY
1
1
1
1
1
2
1
1
1
1
1
BURNER
GAS RATE
PRESSURE
3
m bar.
m
/h
1.4
1.00
13.6
2.74
4.6
0.39
35.0
1.06
DESCRIPTION
Conversion Instructions
LPG Gas Valve Dungs BM771 sl 040 (for LPG to NG)
NG Gas Valve Dungs BM771 sl 040 (for NG to LPG)
Burner gauze
Fibre washer
O rings
Injector 2.7mm
24i LPG
Injector 2.78mm 28i LPG
Injector 4.3mm
24i NG
Injector 4.5mm
28i NG
Copper washer
commissioning procedure to confirm gas soundness and correct
boiler operation.
10. Check and adjust the setting pressures to the values in the
table overleaf and adjust if necessary. Refer to Installation and
Service Instructions Section: Replacement of Parts. "To Set the
Burner Pressure".
Burner
pressure
test point
Main gas
valve
connections
Inlet
pressure
test point
11. Refit the plastic sealing cap to the gas valve modulating
valve adjuster and seal with a dab of paint or similar.
12. Turn off the boiler and when cool peel off the arrow from the
data plate on the combustion chamber front panel and re-stick
against the gas type for which the boiler has been converted
and adjusted.
13. Replace the boiler front panel.
The conversion is now complete.
Table 1.
28i
NOMINAL BOILER RATINGS (10 Minutes After Lighting)
BOILER ADJUSTED FOR G20 (Natural Gas)
OUTPUT
INPUT (Net)
kW
kW
8.0
9.5
27.5
30.0
BOILER ADJUSTED FOR G31 (Propane)
8.0
9.5
27.5
30.0
LPG (Propane): Net Input = Gross Input x 0.922
43
Allen key
Allen key
Clockwise to
Anti-clockwise
Gas valve
sealing
cap
Electrical
connections
modulator
(Blue:Blue)
BURNER
PRESSURE
m bar.
1.2
14.7
3.4
35.3
PART No
8 716 105 654
8 716 105 650
8 716 142 601
8 710 103 043
8 716 140 827
8 716 156 373
8 716 140 209
8 716 105 033
8 716 140 208
8 716 101 994
Max
2mm
Min
3mm
increase
to decrease
Slight
movement
only is
required
GAS RATE
3
m
/h
1.00
3.17
0.39
1.23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

28i junior24i junior

Table of Contents