Basic Operations For Level 2R Storage; Level 2R System Power-Off Procedure - THOMSON K2 Instruction Manual

Hide thumbs Also See for K2:
Table of Contents

Advertisement

Chapter 4 Installing the Level 2R Storage System

Basic operations for Level 2R storage

Use the following procedures as you work on your Level 2R storage system:
For other procedures refer to
System" on page

Level 2R system power-off procedure

Use the following sequence to power-off the Level 2R storage system.
1. Power-off all K2 Media clients or other iSCSI clients.
2. From the K2 System Configuration application, in the tree view select the name of
3. Take note of which is the primary K2 Media Server and which is the backup K2
4. For the backup K2 Media Server, click
5. Shut down the backup K2 Media Server, if it does not shut down automatically.
6. For the primary K2 Media Server, click
7. Shut down the primary K2 Media Server, if it does not shut down automatically.
8. Power-off the primary RAID controller chassis. If expansion chassis are
140
K2 Storage System Instruction Manual
"Level 2R system power-off procedure"
"Level 2R system power-on procedure"
"Using FTP for file transfer"
333.
the K2 Storage System, which is the top node of the storage system tree. Then click
the
Server Control Panel
Media Server. The order in which you put servers back into service when you
power up the K2 Storage System is dependent on their primary/backup roles at the
time when you power down the K2 Storage System.
connected, make sure the power-off of the controller chassis is prior to or
simultaneous with the power-off of its connected expansion chassis. Wait
"Administering and maintaining the K2 Storage
button.
The Server Control Panel opens.
. This takes the server out of service.
Stop
. This takes the server out of service.
Stop
September 6, 2006

Advertisement

Table of Contents
loading

Table of Contents