6  Connection
Connection
Inverter (Speedwire)
Local area network (LAN)
* Designation according to an older standard
28
ClusterController-IA-en-10
Cable requirements
☐ Cable category: from Cat5
☐ Cable structure and shielding: S/UTP, SF/UTP (S-FTP* ),
S/FTP (S-STP*) or SF/FTP
☐ Maximum cable length between two nodes when using patch
cables: 50 m
☐ Maximum cable length between two nodes when using
installation cables: 100 m
☐ When using self-assembly patch cables: two RJ45 connectors
per cable
☐ Cable category: from Cat5
☐ Cable structure and shielding: S/UTP, SF/UTP (S-FTP*),
S/FTP (S-STP*) or SF/FTP
☐ Maximum cable length between two nodes when using patch
cables: 50 m
☐ Maximum cable length between two nodes when using
installation cables: 100 m
☐ When using self-assembly patch cables: two RJ45 connectors
per cable
SMA Solar Technology AG
Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CLUSTER CONTROLLER and is the answer not in the manual?

Questions and answers

Table of Contents